950 W BAR BC RANCH ROAD, Teton County, WY

$20.4M across 2 construction permits, most-advanced: in intake. Lead: New West Building Company Inc.

🗺 Parcel 22-41-16-04-4-00-001 📁 2 permits 📐 35.53 acres
Assessed value & lot dataTeton County Assessor, 2025 Tax Roll
Actual value (market)
$9,986,083
Assessed (taxable)
$948,678
Annual tax
$53,884
Mill levy
56.7990
Owner of record · legal description · value breakdown
Tax-Roll owner
950 BAR BC LLC
175 SULLYS TRL STE 204, PITTSFORD, NY 14534-4560
Tax district
District 0100
Legal description
Sub T-486F · Filing 1
Owner
950 Bar BC LLC, C/O Wildstar Partners
110 E. Atlantic Ave., Suite 200
Architect of record
Anderson Wise Architects
📞 21087818113
Applicant
Andersson Wise Architects
📞 512-637-5794
🛠 Project team — 1 company
Regulatory flags
Slope: More than 15% Floodzone: X Construction: VB

Permits at this property

Active since 2026

Single-family new construction

$20,398,460 combined
👷 Lead: New West Building Company Inc 🪪 CL-24-0130
GEC2022-0128 ↗ Site Work Site grading & erosion control (residential) Intake 5/22/2026

1.58-acre (69,000 SF) ground disturbance at 950 W Bar BC Ranch Road — tied to residential building permit BDR2022-0148, owned by 950 Bar BC LLC c/o Wildstar Partners (out-of-state), with Austin-based Andersson Wise Architects leading; 13 documents on file signal active project progression.

📎 13 docs 📜 12 cond.· 9 awaiting
📎 Documents (13)
📜 Conditions (12) 9 awaiting
  • Temporary disturbances shall be reclaimed upon completion of construction with Teton County native vegetation.
  • Slopes over 30% around the building site shall be well delineated and not disturbed during construction. This included parking and materials. Slopes over 30% may be disturbed as approved for the essential driveway crossing.
  • All work to be in accordance with the attached plans approved on 3/1/2024, and the Teton County Land Development Regulations, Division 5.7 and the standard conditions of division 8.3.4.
  • Awaiting Verification Applicant shall notify the Teton County Engineering Department at (307) 733-3317 at least 48 hours prior to commencement of land disturbing activities.
  • Awaiting Verification Applicant shall notify the Teton County Engineering Department at (307) 733-3317 at least 24 hours prior to commencement of work in live waterbodies.
  • Awaiting Verification The permit and “APPROVED” copy of the grading plans shall be kept on site.
  • Awaiting Verification If site observations reveal that erosion control and storm water management measures are insufficient for their intended functions, additional measures or maintenance shall be implemented by the applicant to correct the problem. The Teton County Engineer has the final authority to determine if additional erosion control measures or storm water management features are required to comply with adopted regulations.
  • Awaiting Verification A final grading and revegetation inspection is required prior to issuance of a Certification of Occupancy or release of financial surety or performance bond.
  • Awaiting Verification Any below-ground facilities that are constructed in order to comply with applicable GEC permit requirements must be documented with sufficient installation photographs, and provided to the Teton County Engineering Department in conjunction with the final inspection.
  • Awaiting Verification This development requires certification by the same design professional responsible for preparing the plans indicating that the work performed conforms to the design. The Applicant shall ensure that the design professional remains sufficiently engaged throughout the project for this purpose.
  • Awaiting Verification Applicant shall ensure compliance with the requirements identified by the Teton County Planning Department in the attached memo.
  • Awaiting Verification Applicant shall implement an invasive species management plan that meets the approval of the Teton County Weed and Pest Control District.
BDR2022-0148 ↗ Construction Single-family new construction Unknown $20.4M 5/19/2026

$20.4M new single-family build at 950 W Bar BC Ranch Road — 6,966 sqft above grade, 7 beds/10 baths, LPG-fired in-floor hydronic heat, corrugated weathering steel roof, black/grey stained timber siding with stone veneer; Austin-based Andersson Wise Architects leading for out-of-state owner 950 Bar BC LLC (c/o Wildstar Partners), currently in plan check revision with 4 documents on file.

📎 4 docs 📜 12 cond.· 6 awaiting
📎 Documents (4)
📜 Conditions (12) 6 awaiting
  • Stamped and approved job site plans shall remain on site throughout the project.
  • Awaiting Verification Structures within the Wildland-Urban Interface must show compliance with the Fire Marshal’s requirements by means of details and/or notes on the submitted plans
  • Awaiting Verification Structures greater than 5,000 gross square feet are required to be fire sprinklered.
  • Verified on 9/5/2025 A Certificate of Placement prepared by a Wyoming licensed Professional Land Surveyor is required for each structure. The location of the structure foundation shall be prepared by the Professional Land Surveyor and submitted to the Teton County Planning & Building Services Department prior to the foundation walls being poured. A foundation wall inspection cannot be scheduled until receipt of certificate showing the location of the foundation matches the approved plans and is approved by the Planning Department.
  • Awaiting Verification All exterior lighting shall comply with the Exterior Lighting Standads of Section 5.3.1, Land Development Regulations. Lighting shall be installed per the approved plans. Should the exterior lighting change in any way, the applicant shall submit revisions including spec sheets to the Planning Department for review and approval, prior to issuance of a Certificate of Occupancy or prior to final inspection of the permitted work. Changes to lighting that require review include fixture design, location of fixtures, the number of fixtures, and lumen amount. Project (Main house + Guest House) approved for 18 shielded downlights, 13 shielded bollards, 28 shielded step lights, 18 shielded path lights and 5 shielded sconces.
  • Awaiting Verification Approved bear resistant trash containers are required per Section 5.1.3, Wild Animal Feeding, Land Development Regulations. At construction sites, all trash recepticles for trash that includes food, food wrappers, or other bear attractants shall be bear-resistant. Containers shall be kept closed and latched at all times. Non-bear-resistant dumpsters or trailers may only be used to store construction trash that does not contain bear-attractants.
  • Temporary development impacts shall be reclaimed with a natural vegetative cover type of equal or higher value upon completion of construction.
  • Verified on 9/5/2025 Prior to permit issuance an Exaction Fee-in-lieu shall be paid to Teton County.
  • Awaiting Verification Slopes over 30% around the building site shall be well delineated and not disturbed during construction. This includes parking and storage of materials. Slopes over 30% may only be disturbed as approved for the essential driveway crossing.
  • Awaiting Verification All fencing on site shall comply with Sec. 5.1.2. Wildlife Friendly Fencing, of the Land Development Regulations, which restricts fence height to 38 inches above ground unless containing livestock, which allows 42 inches. The bottom rail shall be no less than 18 inches above the ground. Spacing between the top rail/wire and adjacent rail/wire shall be at least 12 inches. Buck & rail fencing is prohibited.
  • Any ornamental landscaping planted around the residence shall be species unpalatable to moose to reduce human-wildlife interaction.
  • Any changes to the design, including the structure or site development, require a plan revision. Please submit to the Building DIvision a Letter of Transmittal for Building Permit Revision with appropriate revised drawings. Fees will be assessed for additional square footages, plumbing, mechanical or electrical work, including additional plan review fees. Revisions to Grading and Septic may also be applicable.
🕒 Recent activity — 8 events on record
Show 2 more routine events
  • New Residential New Construction (Includes Remodel and Addition) at 950 W BAR BC RANCH ROAD, Teton County, WY yesterday
  • New Residential New Construction (Includes Remodel and Addition) at 950 W BAR BC RANCH ROAD, Teton County, WY yesterday