PropertyTown of Jackson

915 SIMON LANE, Jackson, WY

1 site-work permit, all of uncertain status.

🗺 Parcel 22-41-16-32-4-05-011 📁 1 permit 📐 0.12 acres
⚠ Sparse coverage: only one permit on record at this address. Deed records and historical permits will fill in as additional sources are integrated.
Assessed value & lot dataTeton County Assessor, 2025 Tax Roll
Actual value (market)
$1,519,700
Assessed (taxable)
$107,123
Annual tax
$6,138
Mill levy
57.2990
Owner of record · legal description · value breakdown
Tax-Roll owner
TOWN OF JACKSON
PO BOX 1687, JACKSON, WY 83001-1687
Tax district
District 0150
Legal description
Sub 00191 · Filing 1 · Lot 36
Value breakdown (2 components)
  • Residential Land $743,750 actual · $52,726 assessed
  • Residential Structure $775,950 actual · $54,397 assessed

Permits at this property

Active since 2026

Municipal demolition

DEM26-0010 ↗ Site Work Municipal demolition Unknown 5/20/2026

Town of Jackson is pulling a demolition permit at 915 Simon Lane — municipal-owned parcel, zero documents attached, no value or scope filed; early-stage lead with no contacts to pursue yet.

📜 9 cond.· 9 awaiting
📜 Conditions (9) 9 awaiting
  • Awaiting Verification The applicant is required to notify the State of Wyoming Asbestos Program for demolition of commercial properties and demolition or complete remodel of residential projects for commercial purposes. Please refer to the attached WYDEQ Memorandum regarding “Asbestos Inspection and Notification Requirements”. As a courtesy, the project address and demolition permit applicant information has been emailed to the Wyoming Asbestos Program at Asbestos.notice@wyo.gov.
  • Awaiting Verification The applicant is advised that 48 hour advanced notice is required to deliver demolition material to the County transfer station. Please call the transfer center at 733-7172.
  • Awaiting Verification Prior to the start of construction activities approved herein, the applicant/contractor shall contact the Engineering Department at 733-3079 and schedule a pre-construction meeting.
  • Awaiting Verification Prior to the start of demolition activities, please call (307) 733-3079 to request a final water meter reading.
  • Awaiting Verification All public traffic, parking, informational, etc. signs shall be removed from the property in a manner that preserves their quality and for reinstallation. Applicant responsible for reposting signs during the construction phase as necessary to provide necessary information. Signs that are not maintained shall be replaced at the applicant’s sole cost.
  • Awaiting Verification Silt fencing shall be erected prior to the start of any work on the site and maintained throughout the duration of construction.
  • Awaiting Verification An public right-of-way permit shall be necessary for any work within the right-of-way.
  • Awaiting Verification Water and sewer services to be abandoned shall be completed during the demolition phase of construction. A bond for the removal of the services shall be required.
  • Awaiting Verification All public streets shall be maintained clear of debris during construction. Should debris be tracked onto public streets from the construction site, it shall be the contractor’s responsibility to clean the affected streets.
🕒 Recent activity — 2 events on record
No noteworthy changes since intake. (2 routine events on record.)
Show 2 more routine events
  • New B-Demolition at 915 SIMON LANE, Jackson, WY yesterday
  • New B-Demolition at 915 SIMON LANE, Jackson, WY yesterday