PropertyTeton County

780 W SPRING CREEK ROAD, Teton County, WY

$40K across 1 permit, all closed. Lead: Owner Builder.

📁 1 permit 📐 4.51 acres
⚠ Sparse coverage: only one permit on record at this address. Deed records and historical permits will fill in as additional sources are integrated.
Assessed value & lot dataTeton County Assessor, 2025 Tax Roll
Actual value (market)
$1,796,636
Assessed (taxable)
$61,762
Annual tax
$3,508
Mill levy
56.7990
Owner of record · legal description · value breakdown
Tax-Roll owner
OKSANEN, ARDEN & ELLIE
780 W SPRING CREEK RD, ALTA, WY 83414-4568
Tax district
District 0102
Value breakdown (3 components)
  • Other Structure $22,594 actual · $2,146 assessed
  • Residential Land $925,652 actual · $20,536 assessed
  • Residential Structure $848,390 actual · $39,080 assessed
🛠 Project team — 1 company

Permits at this property

Active since 2026

Exterior renovation / re-roof and re-side

$40,000 combined
👷 Lead: Owner Builder 🪪 CONT2009-41
MIS2023-0135 ↗ Other Exterior renovation / re-roof and re-side Closed $40K 5/20/2026

$40K exterior renovation at 780 W Spring Creek Rd — brown asphalt shingle roof and light brown wood siding replacement on a sub-500 sqft misc permit; no owner or applicant contacts filed.

📎 1 doc 📜 5 cond.· 2 awaiting
📎 Documents (1)
📜 Conditions (5) 2 awaiting
  • Awaiting Verification Stamped and approved job site plans shall remain on site throughout the project.
  • Verified on 11/20/2025 Approved bear resistant trash containers are required per Section 5.1.3, Wild Animal Feeding, Land Development Regulations. At construction sites, all trash receptacles for trash that includes food, food wrappers, or other bear attractants shall be bear-resistant. Containers shall be kept closed and latched at all times. Non-bear-resistant dumpsters or trailers may only be used to store construction trash that does not contain bear-attractants.
  • The Certificate of Placement is waived.
  • All exterior lighting shall comply with the Exterior Lighting Standards of Section 5.3.1, Land Development Regulations. Lighting shall be installed per the approved plans. Should the exterior lighting change in any way, the applicant shall submit a plans to the Planning Department for review and approval.
  • Awaiting Verification Any changes to the design, including the structure or site development, require a plan revision. Please submit to the Building Division a Letter of Transmittal for Building Permit Revision with appropriate revised drawings. Fees will be assessed for additional square footages, plumbing, mechanical or electrical work, including additional plan review fees. Revisions to Grading and Septic may also be applicable.
🕒 Recent activity — 4 events on record
Show 2 more routine events
  • New Misc for Projects under 500 sq ft at 780 W SPRING CREEK ROAD, Teton County, WY yesterday
  • New Misc for Projects under 500 sq ft at 780 W SPRING CREEK ROAD, Teton County, WY yesterday