Commercial new construction — mixed-use hospitality
▶ ELT2026-0398 ↗ Trade Commercial electrical remodel Active $25K 5/26/2026
Commercial electrical remodel at 7710 Granite Loop Road in Teton Village — zero documents, no value, no contacts filed; bare-minimum submission under review.
▶ 📜 Conditions (1) 1 awaiting
- Awaiting Verification The contractor shall be be on site for all inspections.
▶ REFERENCE-26-0768 ↗ Administrative Commercial new construction — mixed-use hospitality Intake $33.8M 5/26/2026
$33.8M, 5-story mixed-use hospitality build at Teton Village under ABF Snake River LLC / Blue Flag Capital II — MA-based owner Patrick Oullette, NYC architect Michael Luft-Weissberg, applicant Danny Wicke (307-264-2600); occupancies span hotel (R-1), restaurant/bar (A-2.2), retail (M), and office (B), signaling full FF&E, kitchen, and bar fit-out scope ahead.
▶ 📎 Documents (4)
▶ 📜 Conditions (9) 9 awaiting
- Awaiting Verification Stamped and approved job site plans shall remain on site throughout the project.
- Awaiting Verification Structures within the Wildland-Urban Interface must show compliance with the Fire Marshal’s requirements by means of details and/or notes on the submitted plans
- Awaiting Verification Structures greater than 5,000 gross square feet are required to be fire sprinklered.
- Awaiting Verification Structures located within the FEMA, Special Flood Hazard Area shall show compliance with the Flood-Resistive Construction requirements of the IBC
- Awaiting Verification Plans for structures located in areas subject to seasonal high ground water from spring runoff or irrigation, shall be provided with details showing protection of the structure and all insulation, electrical, plumbing and mechanical systems, from damage due to moisture and/or mold, by licensed design professionals, or shall be slab on grade.
- Awaiting Verification A Certificate of Placement prepared by a Wyoming licensed Professional Land Surveyor is required for each structure. The location of the structure foundation shall be prepared by the Professional Land Surveyor and submitted to the Teton County Planning & Building Services Department prior to the foundation walls being poured. A foundation wall inspection cannot be scheduled until receipt of certificate showing the location of the foundation matches the approved plans and is approved by the Planning Department.
- Awaiting Verification Approved bear resistant trash containers are required per Section 5.1.3, Wild Animal Feeding, Land Development Regulations. At construction sites, all trash receptacles for trash that includes food, food wrappers, or other bear attractants shall be bear-resistant. Containers shall be kept closed and latched at all times. Non-bear-resistant dumpsters or trailers may only be used to store construction trash that does not contain bear-attractants.
- Awaiting Verification All exterior lighting shall comply with the Exterior Lighting Standards of Section 5.3.1, Land Development Regulations. Lighting shall be installed per the approved plans. Should the exterior lighting change in any way, the applicant shall submit revisions including spec sheets to the Planning Department for review and approval, prior to issuance of a Certificate of Occupancy or prior to final inspection of the permitted work. Changes to lighting that require review include fixture design, location of fixtures, the number of fixtures, and lumen amount.
- Awaiting Verification Any changes to the design, including the structure or site development, require a plan revision. Please submit to the Building Division a Letter of Transmittal for Building Permit Revision with appropriate revised drawings. Fees will be assessed for additional square footages, plumbing, mechanical or electrical work, including additional plan review fees. Revisions to Grading and Septic may also be applicable.
▶ REFERENCE-26-0788 ↗ Administrative Commercial site grading & erosion control Intake 5/26/2026
Commercial grading and erosion control permit at 7710 Granite Loop Road in Teton Village, tied to companion building permit REFERENCE-26-0768, filed by Danny Wicke (307-264-2600) for Boston-based owner Patrick Oullette — zero documents attached and no project value or scope filed yet.
▶ 📜 Conditions (11) 10 awaiting
- — The issuance of this permit signifies that the review of application submittals was conducted solely based on conformance with the Teton County Land Development Regulations for Grading and Erosion Control and makes no evaluation of submitted materials that pertain to drinking water systems or other utilities. DEVIATIONS FROM THE APPROVED PLANS, including grading beyond the limits of disturbance shown and/or failure to comply with the conditions of this permit shall constitute a violation of the Teton County Land Development Regulations and shall be subject to such penalties as described therein.
- Awaiting Verification All work shall be in accordance with the attached plans approved on XX-XX-XXXX, The Teton County Land Development Regulations, and the Teton County Floodplain Management Resolution.
- Awaiting Verification Applicant shall notify the Teton County Engineering Department at (307) 733-3317 at least 48 hours prior to commencement of land disturbing activities.
- Awaiting Verification Applicant shall notify the Teton County Engineering Department at (307) 733-3317 at least 24 hours prior to commencement of work in live waterbodies.
- Awaiting Verification The permit and “APPROVED” copy of the grading plans shall be kept on site.
- Awaiting Verification If site observations reveal that erosion control and storm water management measures are insufficient for their intended functions, additional measures or maintenance shall be required to correct the problem.
- Awaiting Verification A final grading and revegetation inspection is required prior to issuance of a Certification of Occupancy or release of financial surety or performance bond.
- Awaiting Verification Any below-ground facilities that are constructed in order to comply with applicable GEC permit requirements must be documented with sufficient installation photographs, and provided to the Teton County Engineering Department in conjunction with the final inspection.
- Awaiting Verification This development requires certification by the same design professional responsible for preparing the plans indicating that the work performed conforms to the design. The Applicant shall ensure that the design professional remains sufficiently engaged throughout the project for this purpose.
- Awaiting Verification Applicant shall ensure compliance with the requirements identified by the Teton County Planning Department in the attached memo.
- Awaiting Verification Applicant shall implement an invasive species management plan that meets the approval of the Teton County Weed and Pest Control District.
▶ FIRE2025-0118 ↗ Trade Fire alarm and detection system Closed 5/19/2026
Closed fire alarm/detection permit at 7710 Granite Loop Road in Teton Village — no contacts, value, or scope filed; proximity to ski village suggests commercial or high-end lodging application.
▶ FIRE2026-0033 ↗ Trade Fire alarm and detection system Closed 5/19/2026
Closed fire alarm/detection permit at 7710 Granite Loop Road in Teton Village — no contacts, value, or scope documents filed; minimal data available for pursuit.
▶ REFERENCE-26-0667 ↗ Administrative Commercial new construction — hospitality/hotel Intake $17.0M 5/18/2026
$17M, 5-story hotel/hospitality complex at Teton Village under ABF Snake River LLC (Blue Flag Capital II) — Boston-based owner Patrick Oullette, NYC architect Michael Luft-Weissberg (212-273-9712), applicant Danny Wicke (307-264-2600); Type IIIA construction with R-1 hotel, A-3 assembly, and gym uses across 4 submitted documents.
▶ 📎 Documents (4)
▶ 📜 Conditions (9) 9 awaiting
- Awaiting Verification Stamped and approved job site plans shall remain on site throughout the project.
- Awaiting Verification Structures within the Wildland-Urban Interface must show compliance with the Fire Marshal’s requirements by means of details and/or notes on the submitted plans
- Awaiting Verification Structures greater than 5,000 gross square feet are required to be fire sprinklered.
- Awaiting Verification Structures located within the FEMA, Special Flood Hazard Area shall show compliance with the Flood-Resistive Construction requirements of the IBC
- Awaiting Verification Plans for structures located in areas subject to seasonal high ground water from spring runoff or irrigation, shall be provided with details showing protection of the structure and all insulation, electrical, plumbing and mechanical systems, from damage due to moisture and/or mold, by licensed design professionals, or shall be slab on grade.
- Awaiting Verification A Certificate of Placement prepared by a Wyoming licensed Professional Land Surveyor is required for each structure. The location of the structure foundation shall be prepared by the Professional Land Surveyor and submitted to the Teton County Planning & Building Services Department prior to the foundation walls being poured. A foundation wall inspection cannot be scheduled until receipt of certificate showing the location of the foundation matches the approved plans and is approved by the Planning Department.
- Awaiting Verification Approved bear resistant trash containers are required per Section 5.1.3, Wild Animal Feeding, Land Development Regulations. At construction sites, all trash receptacles for trash that includes food, food wrappers, or other bear attractants shall be bear-resistant. Containers shall be kept closed and latched at all times. Non-bear-resistant dumpsters or trailers may only be used to store construction trash that does not contain bear-attractants.
- Awaiting Verification All exterior lighting shall comply with the Exterior Lighting Standards of Section 5.3.1, Land Development Regulations. Lighting shall be installed per the approved plans. Should the exterior lighting change in any way, the applicant shall submit revisions including spec sheets to the Planning Department for review and approval, prior to issuance of a Certificate of Occupancy or prior to final inspection of the permitted work. Changes to lighting that require review include fixture design, location of fixtures, the number of fixtures, and lumen amount.
- Awaiting Verification Any changes to the design, including the structure or site development, require a plan revision. Please submit to the Building Division a Letter of Transmittal for Building Permit Revision with appropriate revised drawings. Fees will be assessed for additional square footages, plumbing, mechanical or electrical work, including additional plan review fees. Revisions to Grading and Septic may also be applicable.