Active since 2026
Interior remodel / misc improvement (under 500 sqft scope)
👷 Lead:
JH Builders
🪪 CL-24-0089
▶ ELT2026-0383 ↗ Trade Low-voltage electrical (unit 939, Teton Village condo) Active $54K 5/20/2026
Bare-minimum low-voltage permit at Granite Loop Road unit 939 in Teton Village — no owner, applicant, value, or scope filed; zero documents attached.
📜 1 cond.· 1 awaiting
▶ 📜 Conditions (1) 1 awaiting
- Awaiting Verification The contractor shall be be on site for all inspections.
▶ MIS2026-0019 ↗ Other Interior remodel / misc improvement (under 500 sqft scope) Unknown $300K 5/19/2026
$300K misc permit at Teton Village condo unit #939 — 4,645 sf existing above-grade habitable area signals a substantial unit, revision cycle active with 2 docs on file, but no owner, applicant, or architect identified.
📐 4,645 sf
📎 2 docs
📜 6 cond.· 6 awaiting
▶ 📎 Documents (2)
▶ 📜 Conditions (6) 6 awaiting
- Awaiting Verification Stamped and approved job site plans shall remain on site throughout the project.
- Awaiting Verification Structures within the Wildland-Urban Interface must show compliance with the Fire Marshal’s requirements by means of details and/or notes on the submitted plans
- Awaiting Verification Structures greater than 5,000 gross square feet are required to be fire sprinklered.
- Awaiting Verification Approved bear resistant trash containers are required per Section 5.1.3, Wild Animal Feeding, Land Development Regulations. At construction sites, all trash receptacles for trash that includes food, food wrappers, or other bear attractants shall be bear-resistant. Containers shall be kept closed and latched at all times. Non-bear-resistant dumpsters or trailers may only be used to store construction trash that does not contain bear-attractants.
- Awaiting Verification Any changes to the design, including the structure or site development, require a plan revision. Please submit to the Building Division a Letter of Transmittal for Building Permit Revision with appropriate revised drawings. Fees will be assessed for additional square footages, plumbing, mechanical or electrical work, including additional plan review fees. Revisions to Grading and Septic may also be applicable.
- Awaiting Verification All exterior lighting shall comply with the Exterior Lighting Standards of Section 5.3.1, Land Development Regulations. Lighting shall be installed per the approved plans. Should the exterior lighting change in any way, the applicant shall submit revisions including spec sheets to the Planning Department for review and approval, prior to issuance of a Certificate of Occupancy or prior to final inspection of the permitted work. Changes to lighting that require review include fixture design, location of fixtures, the number of fixtures, and lumen amount. No Exterior Lighting was proposed.