Active since 2026
Single-family new construction
👷 Lead:
Northview Building Group LLC
🪪 CL-24-0063
▶ ELT2026-0393 ↗ Trade Low-voltage electrical (residential/rural) Active $15K 5/21/2026
Low-voltage electrical permit issued for a property on H-H-R Ranch Road in Wilson — no contacts, value, or scope detail filed; minimal data to qualify the lead.
📜 1 cond.· 1 awaiting
▶ 📜 Conditions (1) 1 awaiting
- Awaiting Verification The contractor shall be be on site for all inspections.
▶ BDR2025-0068 ↗ Construction Single-family new construction Intake $9.0M 5/18/2026
$9M ground-up single-family build at 5080 H-H-R Ranch Road, Wilson — 4,599 sqft above grade, 3 bed/4 bath, standing seam metal roof and pre-finished wood siding; IL-based owner Adrian Jaronczyk working with Northworks Architects, applicant Lauren Wick (215-589-9403), 8 documents filed.
📎 8 docs
📜 11 cond.· 7 awaiting
▶ 📎 Documents (8)
- · BDR2025-0068R.pdf ↗
- · BDR2025-0068 Building Permit.pdf ↗
- · 250430_Jaronczyk_PERMIT ToJ County Connections_5080 HHR RANCH RD.pdf ↗
- · BDR2025-0068 LDR Checklist.pdf ↗
- · BDR2025-0068R LDR Checklist_Revision.pdf ↗
- · Site plan ↗
- · Exterior Lighting Summary & Specs ↗
- · Architectural Drawings drawn to scale ↗
▶ 📜 Conditions (11) 7 awaiting
- Awaiting Verification Structures within the Wildland-Urban Interface must show compliance with the Fire Marshal’s requirements by means of details and/or notes on the submitted plans
- Awaiting Verification Structures greater than 5,000 gross square feet are required to be fire sprinklered.
- — Stamped and approved job site plans shall remain on site throughout the project.
- Awaiting Verification A Certificate of Placement prepared by a Wyoming licensed Professional Land Surveyor is required for each structure. The location of the structure foundation shall be prepared by the Professional Land Surveyor and submitted to the Teton County Planning & Building Services Department prior to the foundation walls being poured. A foundation wall inspection cannot be scheduled until receipt of certificate showing the location of the foundation matches the approved plans and is approved by the Planning Department.
- Awaiting Verification All exterior lighting shall comply with the Exterior Lighting Standards of Section 5.3.1, Land Development Regulations. Lighting shall be installed per the approved plans. Should the exterior lighting change in any way, the applicant shall submit revisions including spec sheets to the Planning Department for review and approval, prior to issuance of a Certificate of Occupancy or prior to final inspection of the permitted work. Changes to lighting that require review include fixture design, location of fixtures, the number of fixtures, and lumen amount. Approved for 11 shielded sconces.
- — Approved bear resistant trash containers are required per Section 5.1.3, Wild Animal Feeding, Land Development Regulations. At construction sites, all trash receptacles for trash that includes food, food wrappers, or other bear attractants shall be bear-resistant. Containers shall be kept closed and latched at all times. Non-bear-resistant dumpsters or trailers may only be used to store construction trash that does not contain bear-attractants.
- — Any changes to the design, including the structure or site development, require a plan revision. Please submit to the Building Division a Letter of Transmittal for Building Permit Revision with appropriate revised drawings. Fees will be assessed for additional square footages, plumbing, mechanical or electrical work, including additional plan review fees. Revisions to Grading and Septic may also be applicable.
- Awaiting Verification Prior to Certificate of Occupancy, the proposed habitat mitigation as shown on site plan by Alder Environmental dated April 28, 2025, shall be completed.
- Awaiting Verification Dog Run fence approved with 4’ high, enclosed wood siding face.
- Awaiting Verification Prior to issuance of a Certificate of Occupancy, the applicant shall either retain or install one (1) Plant Unit on the subject property. Refer to Section 5.3.3 F, Land Development Regulations, for standard plant unit alternatives.
- — Revised site plan dated 3/5/26 NOT APPROVED by this revision. Wetland setbacks not being met in open space, 30 ft buffer required for all development.