Active since 2026
Site grading
▶ E26-0108 ↗ Trade Site grading Active 5/15/2026
Snow King Mountain Resort, LLC pulling a grading permit at 402 E Snow King Ave — no valuation, scope documents, or applicant contacts filed; excavation and earthwork contractors should reach out directly to the resort to get ahead of bidding.
📜 3 cond.
▶ 📜 Conditions (3)
- — Prior to the start of construction activities approved herein, the applicant/contractor shall contact the Engineering Division and schedule a pre-construction meeting. Failure to meet with the Engineering Division prior to the start of construction activities may result in stoppage of work on site.
- — Approved sedimentation controls and silt retention shall be placed at low points and points of discharge or as shown on plans and provided during construction as needed to prevent offsite storm flow. Straw waddles and/or coconut rolls are recommended.
- — Storm manhole shall be protected throughout construction using approved inlet barriers to control sediment, silt, and debris from entering the stormwater system.