Active since 2026
Residential interior remodel (non-habitable to habitable conversion)
👷 Lead:
Wilderness Builders
🪪 CL-24-0195
▶ BDR2026-0049 ↗ Construction Residential interior remodel (non-habitable to habitable conversion) Intake $400K 5/11/2026
$400K remodel at 3720 W Esther Way, Teton Village — Heath Kuszak of Agrostis Inc. (307-413-1883) converting 877 SF of non-habitable space to habitable within an existing 4,675 SF home, with cove heaters being installed room-by-room; CA-based owner Doug Yarrow (North Ranch Partners, LLC) and architect John Kjos (208-201-1779) attached, WUI clearance already filed (WUI2026-0050).
📐 4,675 sf
📎 4 docs
📜 7 cond.· 3 awaiting
▶ 📎 Documents (4)
▶ 📜 Conditions (7) 3 awaiting
- Awaiting Verification Structures within the Wildland-Urban Interface must show compliance with the Fire Marshal’s requirements by means of details and/or notes on the submitted plans
- Awaiting Verification Structures greater than 5,000 gross square feet are required to be fire sprinklered.
- — Stamped and approved job site plans shall remain on site throughout the project.
- — The Certificate of Placement is waived.
- Awaiting Verification All exterior lighting shall comply with the Exterior Lighting Standards of Section 5.3.1, Land Development Regulations. No new lighting is proposed or approved.
- — Approved bear resistant trash containers are required per Section 5.1.3, Wild Animal Feeding, Land Development Regulations. At construction sites, all trash receptacles for trash that includes food, food wrappers, or other bear attractants shall be bear-resistant. Containers shall be kept closed and latched at all times. Non-bear-resistant dumpsters or trailers may only be used to store construction trash that does not contain bear-attractants.
- — Any changes to the design, including the structure or site development, require a plan revision. Please submit to the Building Division a Letter of Transmittal for Building Permit Revision with appropriate revised drawings. Fees will be assessed for additional square footages, plumbing, mechanical or electrical work, including additional plan review fees. Revisions to Grading and Septic may also be applicable.