Active since 2026
Misc small project / sub-500 sqft scope
👷 Lead:
Wilkinson-Montesano Builders
🪪 CL-24-0207
▶ MIS2025-0076 ↗ Other Misc small project / sub-500 sqft scope Closed $135K 5/20/2026
$135K misc permit at 3300 E Alta Ski Hill Road — sub-500 sqft scope near Alta ski area; no owner, applicant, or trade details filed, but finaled status confirms work is complete with 2 documents on record.
📎 2 docs
📜 6 cond.· 5 awaiting
▶ 📎 Documents (2)
▶ 📜 Conditions (6) 5 awaiting
- Awaiting Verification Stamped and approved job site plans shall remain on site throughout the project.
- Awaiting Verification Structures within the Wildland-Urban Interface must show compliance with the Fire Marshal’s requirements by means of details and/or notes on the submitted plans
- Awaiting Verification Structures greater than 5,000 gross square feet are required to be fire sprinklered.
- Awaiting Verification Approved bear resistant trash containers are required per Section 5.1.3, Wild Animal Feeding, Land Development Regulations. At construction sites, all trash receptacles for trash that includes food, food wrappers, or other bear attractants shall be bear-resistant. Containers shall be kept closed and latched at all times. Non-bear-resistant dumpsters or trailers may only be used to store construction trash that does not contain bear-attractants.
- Awaiting Verification Any changes to the design, including the structure or site development, require a plan revision. Please submit to the Building Division a Letter of Transmittal for Building Permit Revision with appropriate revised drawings. Fees will be assessed for additional square footages, plumbing, mechanical or electrical work, including additional plan review fees. Revisions to Grading and Septic may also be applicable.
- — The Certificate of Placement is waived.
▶ MIS2026-0081 ↗ Other Re-roof Intake $9K 5/20/2026
$9K re-roof at 3300 E Alta Ski Hill Road spec'd for 29-gauge Tuff Rib metal panels in dark brown — no owner or applicant contacts filed, payment still pending, zero documents attached.
📜 2 cond.· 2 awaiting
▶ 📜 Conditions (2) 2 awaiting
- Awaiting Verification If any sheathing or roof framing needs to be altered or replaced, work stop and building official contacted.
- Awaiting Verification All exterior building materials shall be earth tone in color and shall be non-reflective prior to installation. Pure white and untreated metals, such as steel or copper, are prohibited.