Active since 2026
Commercial new construction (accessory/utility structure)
👷 Lead:
WEST FORK CONSTRUCTION LLC
🪪 CL-24-0079
▶ BDC2025-0018 ↗ Construction Commercial new construction (accessory/utility structure) Approved $1.0M 5/22/2026
$1M commercial permit for Mangy Moose (bar/restaurant) at Teton Village — Rafe Cordell/Teton Village Association (307-690-0769) is applicant under owner David Yoder; tiny 152 sf Type IB structure classified as Utility/Miscellaneous occupancy, floodzone status unresolved, 6 documents attached.
📐 152 sf
📎 6 docs
📜 9 cond.· 7 awaiting
▶ 📎 Documents (6)
▶ 📜 Conditions (9) 7 awaiting
- Awaiting Verification Stamped and approved job site plans shall remain on site throughout the project.
- Awaiting Verification Structures within the Wildland-Urban Interface must show compliance with the Fire Marshal’s requirements by means of details and/or notes on the submitted plans
- Awaiting Verification Structures greater than 5,000 gross square feet are required to be fire sprinklered.
- Awaiting Verification Any changes to the design, including the structure or site development, require a plan revision. Please submit to the Building Division a Letter of Transmittal for Building Permit Revision with appropriate revised drawings. Fees will be assessed for additional square footages, plumbing, mechanical or electrical work, including additional plan review fees. Revisions to Grading and Septic may also be applicable.
- — The Certificate of Placement is waived.
- Awaiting Verification Approved bear resistant trash containers are required per Section 5.1.3, Wild Animal Feeding, Land Development Regulations. At construction sites, all trash receptacles for trash that includes food, food wrappers, or other bear attractants shall be bear-resistant. Containers shall be kept closed and latched at all times. Non-bear-resistant dumpsters or trailers may only be used to store construction trash that does not contain bear-attractants.
- Awaiting Verification All exterior building materials shall be earth tone in color and shall be non-reflective prior to installation. Pure white and untreated metals, such as steel or copper, are prohibited.
- — Applicant is responsible for obtaining neighbors approval for temporary construction access easement.
- Awaiting Verification fire barriers shall have a listed assembly provided for construction and inspection purposes. Penetrations shall comply with IBC 714, fire caulking and/or fire/smoke dampers