Active since 2026
Commercial new construction
👷 Lead:
ACM WYOMING
🪪 CL-24-0117
▶ BDC2024-0027 ↗ Construction Commercial new construction Closed $250K 5/20/2026
Jackson Hole Mountain Resort is building the 2,729 sf, 2-story RPK3 Restaurant at Teton Village for $250K — architect Hans Schuldt of Studio 307 (local, 307-734-9017) leading the finaled A-2.2/B/S-1 mixed-occupancy commercial build.
📐 2,729 sf
📎 6 docs
📜 8 cond.· 6 awaiting
▶ 📎 Documents (6)
▶ 📜 Conditions (8) 6 awaiting
- Awaiting Verification Stamped and approved job site plans shall remain on site throughout the project.
- Awaiting Verification Structures within the Wildland-Urban Interface must show compliance with the Fire Marshal’s requirements by means of details and/or notes on the submitted plans
- Awaiting Verification Structures greater than 5,000 gross square feet are required to be fire sprinklered.
- Awaiting Verification Any changes to the design, including the structure or site development, require a plan revision. Please submit to the Building Division a Letter of Transmittal for Building Permit Revision with appropriate revised drawings. Fees will be assessed for additional square footages, plumbing, mechanical or electrical work, including additional plan review fees. Revisions to Grading and Septic may also be applicable.
- — The Certificate of Placement is waived.
- Awaiting Verification Approved bear resistant trash containers are required per Section 5.1.3, Wild Animal Feeding, Land Development Regulations. At construction sites, all trash receptacles for trash that includes food, food wrappers, or other bear attractants shall be bear-resistant. Containers shall be kept closed and latched at all times. Non-bear-resistant dumpsters or trailers may only be used to store construction trash that does not contain bear-attractants.
- Awaiting Verification All exterior lighting shall comply with the Exterior Lighting Standards of Section 5.3.1, Land Development Regulations. No changes to lighting are approved by this permit. Should the exterior lighting change in any way, the applicant shall submit revisions including spec sheets to the Planning Department for review and approval, prior to issuance of a Certificate of Occupancy or prior to final inspection of the permitted work. Changes to lighting that require review include fixture design, location of fixtures, the number of fixtures, and lumen amount.
- — Applicants are responsible for ensuring that they have obtained all/any required HOA or TVAC approvals and abiding by any conditions of those approvals.
▶ PLB2024-0157 ↗ Trade Plumbing — specialty permit Closed 5/20/2026
Finaled plumbing permit at 3265 W Village Drive, Teton Village — no value, owner, scope, or documents filed; minimal data to qualify lead.