PropertyTown of Jackson

2800 RANCH HOUSE CIRCLE, Teton County, WY

1 trade permit, all stalled in intake.

🗺 Parcel 22-40-17-12-4-01-093 📁 1 permit 📐 8.82 acres
⚠ Sparse coverage: only one permit on record at this address. Deed records and historical permits will fill in as additional sources are integrated.
Assessed value & lot dataTeton County Assessor, 2025 Tax Roll
Actual value (market)
$9,058,660
Assessed (taxable)
$860,573
Annual tax
$48,880
Mill levy
56.7990
Owner of record · legal description · value breakdown
Tax-Roll owner
3 CREEK RANCH GOLF CLUB
2800 RANCH HOUSE CIR, JACKSON, WY 83001-9545
Tax district
District 0100
Legal description
Sub 01108 · Filing 1 · Lot 131
Value breakdown (2 components)
  • Commercial Land $1,372,960 actual · $130,431 assessed
  • Commercial Improvements $7,685,700 actual · $730,142 assessed

Permits at this property

Active since 2023

Golf club water/sewer connection

E23-0363 ↗ Trade Golf club water/sewer connection Stale Intake 12/28/2023

3 Creek Ranch Golf Club at 2800 Ranch House Circle filed a water/sewer connection permit with zero documents, no applicant, and no project value attached — earliest-stage lead for excavation and plumbing subs serving a high-end private golf facility.

📜 19 cond.· 6 awaiting
📜 Conditions (19) 6 awaiting
  • Awaiting Verification Acceptance of this permit is an acknowledgment that the permitee shall be governed by the laws and regulations as may be provided by the Town of Jackson Mayor and Town Council for the control of the water supply and sewer systems.
  • Awaiting Verification The applicant will provide verbal notice of any changes or modifications that are not consistent with the terms and conditions of this permit to the Town Engineering department at 307 733-3079. The Town Engineering Department may require additional written notice or information to be submitted through the Town’s Building Department and additional review and/or capacity fees may apply.
  • Awaiting Verification Please be advised that the contractor performing the connection shall be required to have a copy of the submitted site plan and standard sewer/water connection details on site.
  • Awaiting Verification NOTE: Following only for the Wilson Sewer District
  • Verify with Suzanne if Wilson Sewer District has knowledge of permit request and if fees have been paid prior to ToJ issuance.
  • Forward the review comment with fees to Suzanne Lagerman at Nelson Engineering.
  • Awaiting Verification NOTE: Following only included for 3 Creeks District
  • The contractor shall be required to contact the Town to review the installation of the potable and irrigation meters and backflow system.
  • Please note that sewer taps require two working days notice. Call 733-3079 to schedule taps in advance.
  • Awaiting Verification NOTE: Following not included for Golf and Tennis District
  • Please note that sewer capacity fees shall be calculated based upon the densest use allowable within the property’s land use zone.
  • Please note that all sewer service pipes extending from the main shall be Schedule 40 PVC pipe.
  • A test tee connection shall be installed for testing purposes. The tee shall be capped and plugged after the County has observed and approved of an infiltration static water test for the service line.
  • The County shall review and approve of the pipe and bedding material.
  • A cleanout shall be required immediately outside the building and every 100’ feet as necessary.
  • The owner shall contact Teton County to schedule an inspection of the service line installation. Occupancy shall not be granted unless the Town has signed off on the building permit for sewer line installation.
  • This permit does not relieve the permitee from any duty to obtain any other permit or authorization that may be required by any provision of federal, state or local codes and ordinances; nor does it permit violation of any section of federal, state or local codes and ordinances.
  • The issuance of this permit confirms that the Town of Jackson has evaluated the application submitted by the permittee and determined that it meets the minimum applicable construction and design standards of the Town’s Land Development Regulations. The compliance with construction standards and the operation and maintenance of the facility to meet the engineer’s design are the responsibility of the permittee, owner, and operation.
  • Nothing in this approval constitutes an endorsement by the Town of Jackson of the construction or the design of the facility described herein. This approval verifies only that the submitted application meets the design and construction standards imposed by the Town’s Land Development Regulations. The Town assumes no liability for, and does not in any way guarantee or warrant the performance or operation of the facility. The permittee, owner, and operator are solely responsible for any liability arising from the construction or operation of the permitted facility.
🕒 Recent activity — 2 events on record
No noteworthy changes since intake. (2 routine events on record.)
Show 2 more routine events
  • New Golf club water/sewer connection at 2800 RANCH HOUSE CIRCLE, Teton County, WY 2d ago
  • New Golf club water/sewer connection at 2800 RANCH HOUSE CIRCLE, Teton County, WY 2d ago