PropertyTeton County

2620 N LILY LAKE DRIVE, WILSON, WY

$1.5M across 1 construction permit, all in intake. Lead: Holderman Construction.

📁 1 permit 📐 1.50 acres
⚠ Sparse coverage: only one permit on record at this address. Deed records and historical permits will fill in as additional sources are integrated.
Assessed value & lot dataTeton County Assessor, 2025 Tax Roll
Actual value (market)
$3,095,917
Assessed (taxable)
$209,188
Annual tax
$11,882
Mill levy
56.7990
Owner of record · legal description · value breakdown
Tax-Roll owner
BURKE FAMILY TRUST
PO BOX 421, CORONA DEL MAR, CA 92625-0421
Tax district
District 0100
Legal description
Sub 00554 · Filing 1 · Lot 1
Value breakdown (3 components)
  • Other Structure $1,110 actual · $105 assessed
  • Residential Structure $1,659,435 actual · $95,201 assessed
  • Residential Land $1,435,372 actual · $113,882 assessed
Owner — out-of-state (CA)
BURKE FAMILY TRUST
PO BOX 421, CORONA DEL MAR, CA 92625-0421
Architect of record
Bryan Gleason
📞 3072009438
Applicant
Bryan Gleason Architects
📞 3072009438
🛠 Project team — 1 company
Regulatory flags
Floodzone: X Construction: VB

Permits at this property

Active since 2026

Residential addition + full remodel

$1,500,000 combined
👷 Lead: Holderman Construction 🪪 7664
BDR2024-0111 ↗ Construction Residential addition + full remodel Intake $1.5M 5/11/2026

$1.5M addition and full remodel of existing 1,006 sf log home in Wilson — doubling to 1,873 sf above grade, metal graphite roof, all-electric heat; architect Bryan Gleason leading for out-of-state Burke Family Trust (Corona del Mar, CA).

📐 1,006 sf 📎 4 docs 📜 5 cond.· 2 awaiting
📎 Documents (4)
📜 Conditions (5) 2 awaiting
  • Stamped and approved job site plans shall remain on site throughout the project.
  • Awaiting Verification A Certificate of Placement prepared by a Wyoming licensed Professional Land Surveyor is required for each structure. The location of the NEW structure foundation shall be prepared by the Professional Land Surveyor and submitted to the Teton County Planning & Building Services Department prior to the foundation walls being poured. A foundation wall inspection cannot be scheduled until receipt of certificate showing the location of the foundation matches the approved plans and is approved by the Planning Department.
  • Awaiting Verification All exterior lighting shall comply with the Exterior Lighting Standards of Section 5.3.1, Land Development Regulations. Lighting shall be installed per the approved plans. Should the exterior lighting change in any way, the applicant shall submit revisions including spec sheets to the Planning Department for review and approval, prior to issuance of a Certificate of Occupancy or prior to final inspection of the permitted work. Changes to lighting that require review include fixture design, location of fixtures, the number of fixtures, and lumen amount. Approved for 12 step lights.
  • Approved bear resistant trash containers are required per Section 5.1.3, Wild Animal Feeding, Land Development Regulations. At construction sites, all trash receptacles for trash that includes food, food wrappers, or other bear attractants shall be bear-resistant. Containers shall be kept closed and latched at all times. Non-bear-resistant dumpsters or trailers may only be used to store construction trash that does not contain bear-attractants.
  • Any changes to the design, including the structure or site development, require a plan revision. Please submit to the Building Division a Letter of Transmittal for Building Permit Revision with appropriate revised drawings. Fees will be assessed for additional square footages, plumbing, mechanical or electrical work, including additional plan review fees. Revisions to Grading and Septic may also be applicable.
🕒 Recent activity — 1 event on record