PropertyTeton County

2270 LEGACY LANE, ALTA, WY

$3.8M across 1 construction permit, all of uncertain status.

📁 1 permit 📐 2.57 acres
⚠ Sparse coverage: only one permit on record at this address. Deed records and historical permits will fill in as additional sources are integrated.
Assessed value & lot dataTeton County Assessor, 2025 Tax Roll
Actual value (market)
$5,340
Assessed (taxable)
$507
Annual tax
$29
Mill levy
56.7990
Owner of record · legal description · value breakdown
Tax-Roll owner
DJG & JWG TRUST
357 S 1840 W, CEDAR CITY, UT 84720-2836
Tax district
District 0102
Legal description
Sub T-260J · Filing 1 · Lot 2
Owner — out-of-state (UT)
David J Grant
357 S 1840 W, CEDAR CITY, UT 84720-2836
Architect of record
Mitch Blake
📞 3077336867
Applicant
Madelyn Langlotz
📞 7168671427
Regulatory flags
Floodzone: X WUI: WUI2025 -0289 Construction: VB

Permits at this property

Active since 2026

Single-family new construction

$3,766,000 combined
BDR2026-0071 ↗ Construction Single-family new construction Unknown $3.8M 5/26/2026

$3.8M new single-family build in Alta — 7,701 sqft above-grade, cedar shake siding, propane boilers in basement, WUI2025-0289 on file; Utah-based owner David J Grant with architect Mitch Blake (307) leading the project.

📎 3 docs 📜 10 cond.· 7 awaiting
📎 Documents (3)
📜 Conditions (10) 7 awaiting
  • Awaiting Verification Structures within the Wildland-Urban Interface must show compliance with the Fire Marshal’s requirements by means of details and/or notes on the submitted plans
  • Awaiting Verification Structures greater than 5,000 gross square feet are required to be fire sprinklered.
  • Stamped and approved job site plans shall remain on site throughout the project.
  • Awaiting Verification A Certificate of Placement prepared by a Wyoming licensed Professional Land Surveyor is required for each structure. The location of the structure foundation shall be prepared by the Professional Land Surveyor and submitted to the Teton County Planning & Building Services Department prior to the foundation walls being poured. A foundation wall inspection cannot be scheduled until receipt of certificate showing the location of the foundation matches the approved plans and is approved by the Planning Department.
  • The Certificate of Placement is waived.
  • Awaiting Verification All exterior lighting shall comply with the Exterior Lighting Standards of Section 5.3.1, Land Development Regulations. Lighting shall be installed per the approved plans. Should the exterior lighting change in any way, the applicant shall submit revisions including spec sheets to the Planning Department for review and approval, prior to issuance of a Certificate of Occupancy or prior to final inspection of the permitted work. Changes to lighting that require review include fixture design, location of fixtures, the number of fixtures, and lumen amount.
  • Awaiting Verification Approved bear resistant trash containers are required per Section 5.1.3, Wild Animal Feeding, Land Development Regulations. At construction sites, all trash receptacles for trash that includes food, food wrappers, or other bear attractants shall be bear-resistant. Containers shall be kept closed and latched at all times. Non-bear-resistant dumpsters or trailers may only be used to store construction trash that does not contain bear-attractants.
  • Awaiting Verification All exterior building materials shall be earth tone in color and shall be non-reflective prior to installation. Pure white and untreated metals, such as steel or copper, are prohibited.
  • Awaiting Verification All fencing on site shall comply with Sec. 5.1.2. Wildlife Friendly Fencing, of the Land Development Regulations, which restricts fence height to 38 inches above ground unless containing livestock, which allows 42 inches. The bottom rail shall be no less than 18 inches above the ground. Spacing between the top rail/wire and adjacent rail/wire shall be at least 12 inches. Buck & rail fencing is prohibited.
  • Any changes to the design, including the structure or site development, require a plan revision. Please submit to the Building Division a Letter of Transmittal for Building Permit Revision with appropriate revised drawings. Fees will be assessed for additional square footages, plumbing, mechanical or electrical work, including additional plan review fees. Revisions to Grading and Septic may also be applicable.
🕒 Recent activity — 1 event on record