Active since 2026
Site grading
▶ E26-0073 ↗ Trade Site grading Unknown 4/22/2026
Teton County is the owner-applicant on this grading permit at 200 S Willow St — no scope, value, or contacts filed; likely county-owned right-of-way or public facility earthwork.
📜 5 cond.
▶ 📜 Conditions (5)
- — PRIOR TO ISSUANCE OF GRADING PERMIT:
- — PRIOR TO THE START OF CONSTRUCTION:
- — Prior to the start of construction activities approved herein, the applicant/contractor shall contact the Engineering Division and schedule a pre-construction meeting. Failure to meet with the Engineering Division prior to the start of construction activities may result in stoppage of work on site.
- — Approved sedimentation controls and silt retention shall be placed at low points and points of discharge or as shown on plans and provided during construction as needed to prevent offsite storm flow. Straw waddles and/or coconut rolls are recommended.
- — The integrity of the existing water and sanitary services shall be verified prior to new connections being made and abandoned services shall be verified when being capped at the main. Please call 733-3079 to schedule inspection. Sanitary sewer services shall be video inspected for verification at applicant/owners expense.